Can the final truck leave on time?

A distributor is considering a warehouse extension. In the four hours before departure its line can prepare 400 cartons, while 480 arrive. Should it invest in the building or change how those four hours are staffed?

Smart Riviera — Delta Consulting ·
Storage aisle in a warehouse

Peak capacity dashboard

Test what happens between the start of picking and the truck departure. The initial settings reproduce the reference case.

Change the assumptions
Cartons expected
480
Cartons ready at departure
400
Cartons still waiting
80
Minutes to clear the queue
48
How the calculation works

Hourly arrivals are multiplied by four. The line prepares 100 cartons per hour, or 120 with support, during the available working time. It can only prepare cartons that have arrived. After departure, arrivals and temporary support end. The line clears the remaining queue at 100 cartons per hour.

The queue starts empty. Rates are constant outside the stoppage and cartons require equal work. A ready carton still needs loading. Estimating a customer delivery delay also requires the transport schedule.

The review in five phases

Each phase explains what the team would do and what evidence the committee would receive.

Phase 1

Frame the decision

The operations manager wants every expected carton ready by the carrier cutoff. The options are to keep the current operation, add staff at peak or investigate a building extension.

DeliverableDecision brief · Identify the affected routes, their deadlines, the alternatives and the budget owner.

Phase 2

Check assumptions against evidence

Reconstruct the final wave using order receipt, picking and departure timestamps. Compare ordinary and peak days. Shipment records alone would conceal the queue.

DeliverableEvidence register · For H01 to H05, record the assumption, its source, the measurement and the open question. The detail follows the scenario comparison.

Phase 3

Compare scenarios and test the breaking point

Apply the same arrivals and stoppages to both staffing options. Extra support clears the reference queue. Some cartons still miss the preparation cutoff when the line stops.

DeliverableOptions comparison · The table shows cartons still waiting at departure. Temporary support is the alternative tested in all four scenarios.

Cartons still waiting at departure
ScenarioArrivals / hDowntimeCurrent operationWith support
Reference1200 min800
Moderate peak1000 min00
High peak1400 min16080
Peak with a breakdown12030 min13060

Fixed fictional assumptions for a like-for-like comparison. Use the dashboard to explore other combinations.

Phase 4

Quantify uncertainty and exposure

With no downtime the current operation just balances at 100 arrivals per hour. At 120, support matches demand exactly. With support, a 30-minute stoppage at the start removes capacity for 60 cartons.

DeliverableSensitivity note · Match affected cartons to individual routes and delivery commitments. The carrier must quote the cost of a second departure.

Phase 5

Assess quality, cost and time

Service quality: track complete orders loaded on time. Cost: compare temporary labour, extra transport and the extension. Time: distinguish queue clearance from the customer delivery time.

DeliverableCommittee note · Pilot temporary staffing during a comparable peak, record before-and-after measurements and then revisit the property investment.

The five assumptions, one by one

Open an assumption to see what it means, which records to request and how to follow it from phase 1 to phase 5.

H01Volumes and demand

How many cartons arrive, and when? A daily average can hide the final wave.

Evidence to requestTimestamped incoming orders, cartons per order, promotion calendar and carrier departures.

What to do in each phase

  1. Phase 1Define the four-hour window and count cartons.
  2. Phase 2Compare arrivals in 15-minute intervals with shipments.
  3. Phase 3Test 100, 120 and 140 arrivals per hour.
  4. Phase 4At 140 per hour, even extra support leaves 80 cartons waiting.
  5. Phase 5Ask how often the peak would have to recur to justify permanent capacity.
Definition of H01
H02Peak capacity

How many ready cartons can leave the line before cutoff? The slowest process limits the flow.

Evidence to requestPicking rate, packing and dock capacity, actual downtime and carrier cutoffs.

What to do in each phase

  1. Phase 1Set a target of zero cartons waiting at departure.
  2. Phase 2Measure each process in the same time window.
  3. Phase 3At 100 cartons per hour for four hours, the line can prepare 400.
  4. Phase 4If 480 arrive, the shortfall is 80 cartons.
  5. Phase 5Check that packing and loading can absorb the extra flow before expanding.
Definition of H02
H03Productivity

Can a reinforced team really prepare 20 more cartons per hour at the same quality?

Evidence to requestHours worked, conforming cartons, errors and rework by team and carton type.

What to do in each phase

  1. Phase 1Specify the expected gain, staffing and quality requirement.
  2. Phase 2Compare similar waves with and without extra support.
  3. Phase 3Test an increase from 100 to 120 cartons per hour.
  4. Phase 4At 120 arrivals per hour, every 5 cartons per hour missing from that target leaves 20 cartons over four hours.
  5. Phase 5Accept the gain only if trials reproduce it without increasing errors.
Definition of H03
H04Ramp-up and readiness

Are the team and the line ready from the first minute they are needed?

Evidence to requestStaff rosters, training records, start-up tests and incident logs.

What to do in each phase

  1. Phase 1Set the time temporary support must be operational.
  2. Phase 2Verify attendance and measure actual start-up times.
  3. Phase 3Test a 30-minute breakdown at the beginning of the wave.
  4. Phase 4With support and 120 arrivals per hour, only 420 of 480 cartons will be ready.
  5. Phase 5Arrange a transport fallback or an earlier staffing plan if the trial fails.
Definition of H04
H05Total cost of ownership

What does each option cost, including the effect on transport and customers?

Evidence to requestTemporary staffing rates, peak frequency, carrier quotations, extension capital and running costs.

What to do in each phase

  1. Phase 1Compare staffing, transport and expansion over the same time horizon.
  2. Phase 2Separate one-off and recurring costs and trace each to its source.
  3. Phase 3Apply rates to the resources each scenario requires.
  4. Phase 4Without rates and peak frequency, annual cost and financial returns remain unknown.
  5. Phase 5Obtain quotes and compare options at the same service level.
Definition of H05

What the committee can decide

Test temporary staffing before committing capital to an extension. In the reference case, 20 extra cartons per hour are enough to prepare all 480. This option has no spare capacity if a process stops.

Conditions for the decision

  • Operations measures actual throughput and errors during the trial.
  • The carrier confirms the loading cutoff and the price of an additional departure.
  • Finance costs the options using the actual frequency of peaks before any property decision.

Where the figures come from

The figures build on SRDC’s fictional warehouse example. The breakdown and changes in arrivals are teaching assumptions. Costs, customer delays and actual client outcomes are unknown. The MIT glossary is a reference for operational terminology.

MIT OpenCourseWare · LAI Lean Academy Glossary ↗